STILT HOUSE GUIDE + PLANS
A 16 x 20 ft house on stilts with a carport underneath, two floors and a half loft, a rooftop rain deck and a gravity water tower. Published free as a basis for off-grid and sustainable living, for anyone to learn from, adapt and build on.
Experimental · educational · build at your own risk
Attribution line to copy: "1333 Stilt House Kit" by Kaiotei / 13 <33 Covenant, CC BY-SA 4.0, 1333covenant.com/irl/house
The source ZIP holds the dimension file, the 3D model and blueprint generators, every sheet as SVG, this guide, and both licenses. Individual sheets are linked under each drawing below.
A scale-up of Kaiotei's 12 x 12 A-frame: same waste-cut logic on a 16 x 20 ft plate, which is two 20 ft shipping crates side by side, or wood or foam framing to the same outside size.
Two full floors plus a loft under half of a 45° metal roof. The other half of the top is a flat metal deck that catches rain. The house stands on posts so it stays dry in flood country and a vehicle parks underneath. The stairs are a separate structure that can be unhooked, and a trap door in floor 1 drops onto the vehicle below.
A wood stove on floor 1 heats every level, cooks and heats water. Solar sits on the roof and on the water tower.
| Piece | Spec |
|---|
- Engineer review. Have a licensed structural engineer size the piers, posts, beams, braces, connections, floors and roof for your site. A raised house on posts takes wind, flood and seismic loads very differently from a house on a slab.
- Permits and code. Ask your building department what applies: residential code, flood zone rules, setbacks, minimum dwelling size, egress, stairs, guards, chimney, plumbing, electrical and solar.
- Site. Check soil bearing, frost depth, flood elevation, drainage, wind and snow loads, wildfire risk and sun path. Put the solar side toward the sun.
- Water. Check local rules on rainwater collection and wells. Plan treatment before anyone drinks stored water.
- Budget and skills. Read the materials estimate below, decide on a shell (crates, wood frame or stucco foam), and be honest about what you can build safely yourself.
Calculated from the same dimension file as the drawings. It is an estimate to plan with, not a cut list. Sizes the kit spec does not fix are marked for your engineer.
| Group | Item | Qty | Notes |
|---|
| Section | Board feet | Cost |
|---|
► Full lumber takeoff
| Section | Item | Qty | Each | Total |
|---|
* No listing at that exact size: priced from the nearest stocked size at the same price per foot. 8x8 posts and 20 ft treated boards usually come from a lumber yard.
Other materials, priced
| Item | Qty | Each | Total |
|---|
Allowances (typical ranges, not price-checked)
| Item | Range |
|---|
Member sizes here are common residential sizes chosen to make an estimate possible (doubled 2x12 beams, 2x12 floor-1 joists, 2x6 walls at 16", 2x8 rafters). They are not engineering: your engineer may size things up. The water tower carries about 2,400 lb per full tote and will likely need heavier framing than priced. A shipping-crate shell replaces most of the wall framing, wall sheathing and siding with the cost of the crates. Lumber prices move with the market, so re-check before buying.
Price sources:
- S-101 Lay out the 16 x 20 plate and the post grid, then pour piers below the frost and flood line.
- S-101 / S-102 Set the six posts on uplift-rated bases, plumb and brace them temporarily, then fit the 45° knee braces.
- S-102 Set the doubled beams on the 20 ft sides and the three crossbeams, then joists at 24 in. Frame the trap door opening with doubled headers and trimmers. Deck floor 1.
- A-101 / A-301 Build or set the shell to 16 ft: crate pair, wood frame or stucco foam, same outside size. Frame floor 2 partway up, leaving the stair opening.
- A-301 Frame the top: loft and deck floor across the full plate.
- A-202 / A-301 Raise the 45° roof over the loft half and close both gables, with the loft door onto the deck.
- A-101 Lay the metal rain deck on the other half, pitched to its own gutters, and build its guard rail.
- A-201 / A-202 Dry-in: windows, doors, flashing, roofing, siding.
- A-301 Install the listed wood stove, hearth and class-A chimney, following the maker's clearances. Fit smoke and CO alarms now.
- S-101 / P-101 Build the water tower on its own piers, set the two IBC totes, and run the rain line through the first-flush and filter to the upper tote. Then run the gravity supply into floor 1.
- P-101 Solar on the south roof slope and the tower, with the controller and batteries wired by a licensed electrician.
- A-401 Build the detached porch and stair on their own posts and pad. The porch guard and stair rails meet at the top newel.
Water
The deck half is 160 sf. One inch of rain on the whole 320 sf roof is about 200 gallons, so the deck yields about 100 gallons per inch after first-flush. Water goes through a filter into the upper tote, overflows into the lower one, and reaches the house by gravity.
A closed rain loop cannot run a free pump. To lift water without the grid, use a hydraulic ram pump if you have a stream with fall, or a hand or small solar pump, then let gravity do the daily work. Filter and disinfect before drinking.
Heat and power
Floor-1 wood stove, chimney through all three levels. Cook and heat water on it. Stove clearances, hearth size and chimney height come from the stove's listing, NFPA 211 and your local code.
PV on the house roof and the tower. Finish the envelope and the stove before buying more panels. Later additions in the kit notes: an extra bay, a greenhouse under the stilts, a ram pump, a stove-side thermosiphon, a second tower.
- Working at height: the floor sits 10 ft up and the deck 26 ft up. Use guardrails, scaffolding and fall protection, and never work alone at height.
- Smoke and CO alarms on every level and in the loft. Wood stoves and propane heaters both make carbon monoxide.
- Generators run outside only, away from doors, windows and the carport.
- Keep fuel cans out of the carport and away from the stair and piers.
- Electrical, gas and solar work by licensed trades where your code requires it.
Everything is generated from one file, dims.js. Change the plate size, floor heights, window positions or tower layout there, then regenerate. The 3D model, all ten sheets and the materials estimate follow automatically.
- dims.js: every dimension, in feet.
- model.js: the 3D model (three.js), exported as GLB.
- plans.js: the blueprint sheets (SVG) and the materials estimate.
- tools/build_downloads.py: rebuilds the SVGs, PDFs, GLB and ZIP.
Share what you change under CC BY-SA 4.0 so the next builder can learn from it too.
Tap a sheet's link to open it full size. The PDF above has all ten on 11 x 17 paper.
Devised by Kaiotei from lived builds. Math and research support from AI. Published by 13 <33 Covenant.